Electrical Switch Station Upgrade without power down
The client want to transfer all loads and electrical automation connections to a new switchboard, which is nearly 85 metres away from the existing. The issue is that they do not want to power down. They want the hot transfer while every other system is running. Note, switchboards are on the same bus bars without Bus-Tie, and are live. How can this be achieved without risk of electric shock?