TAMFIS NIG LTDRC 8067447CAC ACTIVEFinima, Bonny Island, Rivers State

For procurement, contracts and supply-chain personnel

Procurement / vendor information

What a vendor-management analyst needs to onboard TAMFIS NIG LTD, on one page.

Core service categories

Services offered

  • E&I design
  • Installation
  • Commissioning
  • Maintenance
  • Calibration
  • Panel wiring
  • Instrumentation hook-up
  • Hazardous-area wiring
  • Control systems integration
  • Loop checking
  • Cable installation and termination
  • Earthing and lightning protection
  • Motor control centre work
  • Field instrument servicing

Registrations and compliance

Status table

Each credential shows its true status. Not currently held means not held.

Compliance and registrations status
CredentialStatusDetail
CAC registrationHeldACTIVE · RC 8067447 · Since 11 November 2024
Tax Identification Number (TIN)HeldACTIVE · Tax ID 2523323033976
NOGIC JQS registrationApplication in progressRegistration in preparation; service category to be confirmed.
OGISP service permitApplication in progressRegulator selection (NUPRC upstream or NMDPRA midstream/downstream) pending confirmation of target-client segment.
NCDMB Nigerian Content complianceApplication in progressNigerian Content compliance posture in progress.
Insurance coverNot currently heldNo insurance policy currently held.
Professional indemnity insuranceNot currently heldNo professional indemnity policy currently held.
HSE management systemNot currently heldHSE policy statement published; formal HSE-MS certification not yet held.
ISO certificationsNot currently heldNo ISO certification currently held.

Vendor information

Vendor documentation

Vendor documentation packs and compliance evidence are supplied on request. Mobilisation of named personnel is arranged through TAMFIS NIG LTD as the contracting party.

Capability statement

Download

A printable capability statement is generated from this page's data, so it cannot drift from the site.

Geographic coverage

Where we work

Registered and operating from Finima, Bonny Island, Rivers State — the operating environment of NLNG and the surrounding facilities. Delivery across the Niger Delta and Nigeria.

Key technical capabilities

Standards and equipment

  • IEC
  • IEEE
  • NEC
  • NFPA
  • API RP 500 and API RP 505 (hazardous-area classification)
  • ISA standards for instrumentation
  • Transmitters (pressure, temperature, flow, level)
  • Control valves and positioners
  • PLC, DCS and SCADA systems
  • Variable frequency drives
  • Motors
  • Motor control centres
  • Switchgear
  • Analysers
  • Fire and gas detection systems
  • Fieldbus and HART networks

Full capability statement

Project experience summary

Company portfolio and leadership track record

Engagements where TAMFIS NIG LTD, or its predecessor business, was the contracting party.

Victory Crown Enterprise

Consulting

DAGOREG & Partners

Consulting

Tushebro Global Services Ltd

Consulting

Several private individuals

Consulting

Building and construction

The projects below were delivered by the named principals while employed by the contractors named on each project. They are presented as evidence of individual technical depth rather than as company contracts.

Leadership track record: contractor, project, sector and period
Contractor / clientProject / engagementIndustry / sectorPeriod
AOS Orwell LimitedNLNG project, Finima, Bonny (ongoing engagement)Oil and gasFebruary 2021 to present
ARCO M&E and Pivot-GIS Nig. LtdStrategic shutdown maintenance coordinationOil and gas, maintenanceOctober 2017 to February 2021
Dalf Eti Nigeria LimitedStrategic project managementEngineering and constructionNovember 2015 to March 2017
SNEF Nigeria LtdTotal EPL flare-out projects, offshoreOil and gas, offshoreMay 2014 to September 2015
Techint Cimimontubi Nigeria LtdChevron EGTL1 project, Escravos, Delta StateOil and gas, EPCFebruary 2010 to May 2013
Nigeria Westminster Dredging Marine Ltd (DAGOREG & Partners)Road 33 extension lighting projectInfrastructure, civil engineeringAugust 2009 to January 2010
EC/DBNNLNG OSBL Six (ASI) project, including 132kV integrationOil and gas, engineering2007 to May 2009
Techint Cimimontubi Nigeria LtdNLNG project, Finima, Bonny L.G.A.Oil and gas, constructionOctober 2006 to September 2007
Julius Berger Nig. PlcNLNG Train 1 and 2 base projectConstruction and infrastructureAugust 1996 to February 1998

Quality and HSE

HSE, quality and insurance status

HSE, quality and insurance status
CredentialStatusDetail
Insurance coverNot currently heldNo insurance policy currently held.
Professional indemnity insuranceNot currently heldNo professional indemnity policy currently held.
HSE management systemNot currently heldHSE policy statement published; formal HSE-MS certification not yet held.
ISO certificationsNot currently heldNo ISO certification currently held.

Actions

Request documents, start prequalification or send an RFQ

Request vendor documentation Start prequalification Submit RFQ